2014 ……………………………………………………………………………………………………………………………………
2014. Sept. Rapid scaffolding new workshop came into use.
2014.May Rapid scaffolding provided setting system for IAAF 2014
2013 ……………………………………………………………………………………………………………………………………
2013. Aug Rapid Scaffolding passed the accreditation of ISO14001 and OHSAS18001
2013. Mar The products of Rapid Scaffolding pass the EN 12811-1:2003 Standard test, and obtain the CE Certificate.
2013 March The products of Rapid Scaffolding pass the EN 12811-1:2003 Standatd test, and obtain the CE Certificate.
2012 ……………………………………………………………………………………………………………………………………
2012 Jun, Rapid scaffolding provided formwork and scaffoldings for HongKong-ZhuHai-Macao Bridge Project.
2012 Jan. Rapid Scaffolding participates in the American Concrete Show.
April Rapid Scaffolding participates in the Canton Fair.
May Rapid Scaffolding joins American Scaffolding Association SAIA.
2011 ……………………………………………………………………………………………………………………………………
2011 Mar, Rapid scaffolding expanded work shop to 12000 square meters, production ability increased to 10000 T/year.
2011 June The products of Rapid Scaffolding meet the Australia Standard AS.
July The products of Rapid Scaffolding pass the United States Ansi10.8 Standard.
Aug. Rapid Scaffolding participates in the Brazilian Concrete Show.
Nov. The National Technical specification written by Rapid Scaffolding is put into practice.
2010 ……………………………………………………………………………………………………………………………………
2010 May, Rapid scaffolding expanded workshop and added a new production line. Production ability increased to 5000T/year.
2010 Jan. Rapid Scaffolding joins Chinese Formwork Association
Feb. Rapid Scaffolding provides stages for Shanghai Exposition.
Aug. Rapid Scaffolding provides a thirty-thousand-people stage for F1 in Korea.
Nov. Rapid Scaffolding provides stages and lighting scaffolds for Guangzhou Asian Games.
2009 ……………………………………………………………………………………………………………………………………
2009 March Rapid Scaffolding provides maintenance scaffold for airplane for Thailand Airport.
Aug. Rapid Scaffolding achieves the Quality System Certificate ISO9001:2008.
2008 ……………………………………………………………………………………………………………………………………
2008 Aug.Rapid Scaffolding provides the stages and lighting scaffolds for Beijing Olympic Games.
2007 ……………………………………………………………………………………………………………………………………
2007 Sept, Rapid scaffolding provided stage and light scaffoldings for Special Olympics World Summer Games 2007
2007 May, Rapid scaffolding moved into new workshop and office, stuff increased to 60 people.
2006……………………………………………………………………………………………………………………………………
2006 Mar, Rapid scaffolding passed the accreditation of ISO 9001:2000 International Quality Management System.