Rapid Scaffold Assisted in Reparing the Lingshan Brahma Palace

工程-灵山梵宫 (1)
Rapid Scaffold Assisted in Reparing the Lingshan Brahma Palace

15th Nov. 2017 - 20 year’s anniversary of the establishment of Mt. Lingshan Grand Buddha Scenic Area, and on the same day, the Brahma Palace reopened its door to the travellers again, after 1 year’s reparing. As one of the main landmark scenic area, Brahma Palace is located beside the Taihu Lake Wuxi city, at the bottom of Mt. Lingshan, and just close to the Grand Buddha. With 70,000 sq. meters (83,719 sq. yards) on its three floors, the majestic palace shows a classic expo on the profound Buddhist culture and brilliant traditional art in China. With a symmetrical layout, the palace is built of stone with grand halls, high porch pillars, wide girders and towering domes. The cost of this art palace building took 1.8 billion RMB at that time. However, a fire disaster happened on 8th Nov. 2016, which destroied most of the building.
工程-灵山梵宫 (2)
On 10th Nov. 2016, Rapid Scaffold got the urgent notification from customer, and rushed to the field of fire. When seeing such a mess situtation, we were grieved but designed the ringlock scaffolding case for repairing of the building at the soonest time. On 11th Nov. 2016, the scaffolding equipment began to be delivered to the site, which started the repairing work for the Brahma Palace. As the complicated site condition, limited room, many other related fix staff, but we also overcame all the difficulties, we sent nearly 80 scaffolders, took 3 daytime and 2 nighttime, finished the scaffolding erection area of 30’000 square meters. With the advantage of high quality product, strong technology and experienced management, Rapid Scaffold team completed client’s requirement – reinforced the structure, then remove the beam etc. on time.
工程-灵山梵宫 (4)
With the progress of the repairing work, a new difficulity brought into Rapid team – within the limited loading floor area, needed to erect a scaffolding tower to 60 meter. After several reserch then finally decided to use the ringlock lattice girder platform, and it met the load requirement very well. During the whole repairing work, Rapid team stayed with the scaffolding there in the site, and offer the related techinical support to the customer, finally finish all the repair work punctuality.