  • Liyang Hydropower Key Project Formwork Support
  • Liyang Hydropower Key Project Formwork Support

Liyang Hydropower Key Project Formwork Support

Liyang hydropower key project is composed of four parts, which are the upper reservoir, the lower reservoir, the water conveyance system and the power plant system. The capacity of power station is 1500000 kilowatts. It transfers 500KV voltage to Jiangsu power grid. It’s annual power generation capacity is designed for 2007000000 kwh, and annual water pumping capacity is 2676000000 kwh.
The formwork support in this project’s upper reservoir and lower reservoir, takes Rapid disk lock steel tubular scaffold system (herein below called “Rapid scaffolding”), using different supporting ways in different areas.
1.In support of large curvature vertebral body structure, it’s difficult for frame body to find a supporting point, then it needs to be mounted at lower steel structure platform, with small unit 0.9*0.9m and step 1.5m.
2.Corbel’s maximum thickness of concrete reaches to 5m, and the narrowest part reaches to 3.4m. The frame body takes small unit 0.9*0.9m with step 1.5m.
     In the upper part of building structure, the top plate supporting height is 48m. The frame body has chosen A type standards (ø60.3*3.2mm) 0.9*0.9m, with step 1.5m and one side fully mounted by diagonal braces.
      In this special formwork supporting project, Rapid scaffolding shows not only the excellent high bearing capacity, high safety, but also the greatly labor cost saving and construction period shorting.